ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
dsk 13
Admin 3
doc 3
Recent Posts
Bathroom electrical
by doc. 08/19/17 06:53 AM
electircal ageing test on IPC
by SIAME. 08/15/17 02:43 AM
electrical aging test on IPC
by gfretwell. 08/15/17 12:27 AM
"Line level" audio on Cat 5?
by gfretwell. 08/08/17 10:39 PM
Fire alarm phone lines and color coding
by gfretwell. 08/08/17 10:26 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,942 Are you busy
175,529 Re: Forum
167,793 Need opinion
Who's Online Now
0 registered members (), 67 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#159429 - 01/19/07 09:14 AM Scheduling Residential Service Calls  
Happi_Man  Offline
Member
Joined: Jun 2002
Posts: 206
Columbus, Ohio - USA
When a residential customers calls do you schedule an appointment with the intent of doing the work or with the intent of estimating the job or does it depend on what the customer tells you on the initial phone call?


Business, Office, Estimating, Legal:

#159430 - 01/19/07 07:14 PM Re: Scheduling Residential Service Calls  
fredricburnisky  Offline
Junior Member
Joined: Jan 2006
Posts: 10
hampstead nc
Usually the customers are calling to get the job done and have called other electricians that either didn't want the job, or never showed up. They need it now, so I try to get it done for them asap. There are tirekickers out there that want a free estimate and are just shopping around for the cheapest contractor. You can easily
distinguish them from the serious customers just by talking to them on the phone. I do not bid jobs, what I do is provide an honest estimate of the probable cost and keep it on the high side. It is better to finish a job that you estimated for 1000.00 and only charge 800.00. This keeps the customers happy that they saved 200.00. Some people are just not worth dealing with, however, and when I run across those I will avoid dealing with them in the future.


#159431 - 01/19/07 08:08 PM Re: Scheduling Residential Service Calls  
hbiss  Offline
Member
Joined: Dec 2003
Posts: 886
Hawthorne, NY USA
It depends on a lot of things. There are valid reasons for either way.

If you do the work right away there is no chance the customer will cancel but they may raise objections to the cost since they haven't been given an estimate to mull over.

Some jobs can be a can of worms throwing your scheduling for a loop. Better to have seen it first so you know what you are up against.

If you are going to do the work right away you need to have a well stocked truck otherwise you will be making a second trip anyway.

Me? Unless it's simple I always estimate the job then schedule it depending on how long it's going to take and the availability of materials.

-Hal


#159432 - 01/19/07 09:37 PM Re: Scheduling Residential Service Calls  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
We like to look at all the jobs first, when they call, we get all the information, on location, type of work, if it is a small job, then for a small dispatch fee we send a man and a truck to do a free estimate, if they accept the estimate, we drop the dispatch fee, otherwise they pay, works well tire kickers, are pretty much eliminated, we get the customers that want the work done.
On larger jobs, we do the same process, but usually do not charge a dispatch fee.


#159433 - 01/22/07 11:47 AM Re: Scheduling Residential Service Calls  
sparky 134  Offline
Member
Joined: Sep 2004
Posts: 91
Joliet, Il, USA
hmmm....tire kickers. A short time back I received a call from a person who purchased a small building and he was in the process of converting into an ice cream/hotdog restaurant. He needed me to do a few small things and hook up his 3phase ice cream serving machine. The problem is the building only had single phase power. I knew I was wasting my time when I walked thru the door and he said, "You're the fifth electrician I've talked to..."

I gave him a price for the job anyway which included installing a single to 3phase converter. I also told him we needed to change out his panel since it was full and the converter needed a 240v/100amp feed.

I didn't hear back from him....



Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7706 MB (Peak: 0.9078 MB) Zlib enabled. Server Time: 2017-08-19 16:58:53 UTC