ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Snakes!!
Snakes!!

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
2 members (Scott35, HotLine1), 40 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Joined: Oct 2004
Posts: 135
B
BobH Offline OP
Member
Just curious to know what some of you estimate for hours. Run a 60 amp 4 wire feeder with pvc (70 ft) hand dug,main panel in basement, install normal receptacles, lights, and wire up a furnace. 60 amp sub-panel with grounding electrode. Nothing out of the norm, just ball park to check to see if I'm too low.

Horizontal Ad
Joined: May 2005
Posts: 706
T
Member
It would all be pretty straight forward except the hand digging. I'd call a trencher for 70'. Do your best to break it down into smaller tasks. Add up the tasks at your normal rate with materials. Add profit and you'll be fine.

Dave

Joined: Jan 2005
Posts: 316
L
Member
I agree with Tiger- The labor spent digging 70' to the proper depth would be more then enough to pay for trencher. A trencher will give you a better job also - when all is back filled just a 4" wide path to seed!

Ken

Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
Why make a project out of it, 6" deep RMC less digging.

Joined: May 2003
Posts: 8
M
Junior Member
with the cost of rmc right now i'd go with the pvc

Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
We save money using RMC even at the increased cost , the labor is the real cost,
30% cheaper job using RMC.

Joined: May 2005
Posts: 23
T
Member
LK, trenching or hand-digging?

Horizontal Ad
Joined: Oct 2004
Posts: 135
B
BobH Offline OP
Member
A friend of mine said he'll bring his small back hoe and trench the 70' for $100, cheaper than a rental and no trailer or delivery charges. I thought about rmc but this particular job just seems easier to run pvc right out of service panel through basement and out with an LB, plastic is just so darn easy to work with and cheap, 1" is .32 cents per foot. One question I have though is concerning the friend with the back-hoe, if he isn't insured I think myself or the homeowner might be taking on undue liability, what are some thoughts on this? Do you guys ever get help from buddies, etc and consider the liability involved.

Joined: Jan 2005
Posts: 316
L
Member
Backhoe ? in someones yard ? think about this tire tracks in the yard, minimum of a 12" wide trench. torn up sod , a whole lot of hand raking doing back fill and filling in the tire tracks. I think a backhoe to be extreme in this case. I would have added the cost of rental of trencher into the job. whats a trencher cost to rent? how much more then $100.
Take no offense these are just my thoughts based on alot of commercial trench work.

Joined: Jun 2003
Posts: 1,143
D
Member
My rental last month of a trencher was $145/day. They set the cut for 6". If it had been flat a 65' run would have taken 30 minutes.

(The area tilted, and had obstructions, so it took a little longer to rassle with the machine).

Don't forget to call JULIE
(or whatever you underground utility locatins service is called near you)



[This message has been edited by DougW (edited 06-03-2005).]

Page 1 of 2 1 2

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,158
Joined: May 2003
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
331,388 Are you busy
256,626 Re: Forum
238,479 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5