ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Linear Power Supply Quits Under Load
by JoeTestingEngr. 10/18/18 08:47 PM
220/230/240V 60Hz Systems
by dsk. 10/17/18 01:25 PM
PLC/HMI Enclosure C2, D1
by ghost307. 10/16/18 03:31 PM
Tingle off the water spigot
by dsk. 10/15/18 02:36 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 11 guests, and 26 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
8 Hour Outage in Kaitaia #146103
10/15/06 10:56 AM
10/15/06 10:56 AM
R
RODALCO  Offline OP
Member
Joined: Dec 2005
Posts: 856
Titirangi, Akld, New Zealand
This morning at around 7 all power was turned off to the main substation in Kaitaia, Northland, New Zealand for a period of up to 12 Hours to do emergency maintenance by Transpower.

The incoming line is a single circuit 110 kV line feeding the Transpower substation 4 x 110 / 33 kV transformers, via the Mangamuka ranges.

My brother lives there and checked with me what was going on there, hence I checked with our Auckland controlroom / fault centre who were aware of contractors blowing rocks in the area and somehow may have damaged insulators or pylons.

It's interesting to see that not many customers up north were notified via radio as there are a couple of big timber mills like JNL Timber.

About 10,000 customers were affected, wonder how the charterclaims are going to work out re the contractor who caused the damage.

He needs a please explain and good insurance I guess.


The product of rotation, excitation and flux produces electricty.
Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Re: 8 Hour Outage in Kaitaia #146104
10/16/06 05:20 AM
10/16/06 05:20 AM
K
kiwi  Offline
Member
Joined: Dec 2004
Posts: 354
christchurch new zealand
Hi Rodalco, so this was an "Unplanned Shut down" ? Should the public ( and private sector) be warned if theres a likelihood of power-cuts due to contractors screwing up ?

You're absolutely right. Large industrial customers need to know straight away if theres a supply problem.

How would a Timber Mill know if the power goes out, wether its an internal problem or not ? Someone would have to go to the substation and check the protection equipment flags ?

Re: 8 Hour Outage in Kaitaia #146105
10/24/06 06:56 AM
10/24/06 06:56 AM
R
RODALCO  Offline OP
Member
Joined: Dec 2005
Posts: 856
Titirangi, Akld, New Zealand
Below are the actual details from that event
Quote:

Quarry blast damages Far North power line - 13 Oct 2006
Blasting at a quarry near Kaitaia this afternoon has damaged a transmission line which supplies Kaitaia and the Far North region.

The incident occurred at the Fairburn Line Quarry, about 10 km east of Kaitaia. Blasted rocks hit wires on the 110 kV transmission line that passes by the quarry.

The power has stayed on but a physical inspection by Transpower’s contractors has determined that the three conductor wires over a distance of about 150 metres have been damaged.

The transmission line is the only electricity supply into the Far North and will have to be removed from service to allow the damaged wires to be replaced. Preparations will be made at the site tonight and tomorrow, with the work likely to occur on Sunday.

Removing the line from service will cut the supply of electricity to the Kaitaia substation. An outage of up to 8 hours may be needed on Sunday in order to complete the work. The details will be worked out with the local lines company, Top Energy.

Top Energy has advised that this will affect all areas north of the Mangamuka Ranges, all of North Hokianga, except Kohukohu township, and all areas north of and including Taupo Bay.

The Police and other emergency services, Kaitaia Hospital, the Juken New Zealand Triboard Mill, Vodafone and Telecom have all been kept informed of the situation.

Details of the planned outage on Sunday will be confirmed tomorrow.

END.

Regards

Raymond


The product of rotation, excitation and flux produces electricty.
Re: 8 Hour Outage in Kaitaia #146106
10/27/06 05:33 AM
10/27/06 05:33 AM
K
kiwi  Offline
Member
Joined: Dec 2004
Posts: 354
christchurch new zealand
So the blasted rocks hit an overhead line ?

Is the "explosive expert" liable ?

Re: 8 Hour Outage in Kaitaia #146107
10/27/06 05:56 PM
10/27/06 05:56 PM
Trumpy  Offline

Member
Joined: Jul 2002
Posts: 8,250
SI,New Zealand
Kiwi,
Quote
So the blasted rocks hit an overhead line ?
Is the "explosive expert" liable ?

As the holder of an explosives licence myself, I would say quite possibly.
Sounds like someone mis-calculated the charge required for the blast.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Tom
Tom
Shinnston, WV USA
Posts: 1,044
Joined: January 2001
Show All Member Profiles 
Top Posters(30 Days)
sparky 11
Popular Topics(Views)
250,580 Are you busy
188,116 Re: Forum
177,764 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.023s Queries: 14 (0.004s) Memory: 0.9698 MB (Peak: 1.1082 MB) Zlib enabled. Server Time: 2018-10-22 05:41:50 UTC