this is a good Q, what if?.... I would venture to say that a solid GEC with many points to earth would serve to bleed off a heavy fault better. the scenario could, with specifics given as to what primary connecting to what secondary, be expanded on here.
![[Linked Image]](https://www.electrical-contractor.net/ubb/biggrin.gif)