ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Tray cable?
by davistrembley. 02/22/19 07:53 AM
Light activation in closet by a broken connection?
by geoff in UK. 02/19/19 01:35 PM
AFDD's coming to the UK
by Texas_Ranger. 02/18/19 02:04 PM
Israel
by Texas_Ranger. 02/18/19 02:01 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 4 guests, and 19 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Commercial Bidding #12640
08/14/02 07:40 AM
08/14/02 07:40 AM
F
FatDog65  Offline OP
Junior Member
Joined: Mar 2002
Posts: 5
Paxton IL
What are some of the methodeds used out there for bidding new commercial construction? Do most of you bid new commercial and new industrial the same way?

Work Gear for Electricians and the Trades
Re: Commercial Bidding #12641
08/14/02 05:08 PM
08/14/02 05:08 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,069
Brick, NJ USA
We bid commercial based on the prints and specs submitted; do our take-off's and apply OH, & % of profit.

Industrial is basically the same methods.

Design/build is a little easier; the take-off process is eliminated as we do the prints and spec.

HotLine1
John


John

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
waymag
waymag
dallas, texas, USA
Posts: 69
Joined: January 2002
Show All Member Profiles 
Top Posters(30 Days)
Admin 9
BigB 3
Popular Topics(Views)
253,318 Are you busy
189,925 Re: Forum
179,648 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.023s Queries: 14 (0.005s) Memory: 0.9418 MB (Peak: 1.0592 MB) Zlib enabled. Server Time: 2019-02-24 01:14:21 UTC