ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photos of the Week:

Tiled Backsplash
Tiled Backsplash Devices

Random Gallery Image:
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 50 guests, and 18 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 4 1 2 3 4
Joined: Jul 2002
Posts: 8,441
Likes: 4
Trumpy Offline OP
Member
Picture submitted by magoo66:

Quote
No service conductors when I took the picture, but other than that, what do you think?

[Linked Image]

Thanks Jeff!. [Linked Image]

Critique away folks. [Linked Image]

Horizontal Ad
Joined: Jul 2003
Posts: 394
B
Member
2 romexes per clamp doesn't fit my style.

Wire ties make for a neat layout but I find I ended up cutting most of them if I have to troubleshoot a panel.

Joined: Feb 2005
Posts: 361
C
Member
Looks nice...BUT (and not to bash the installer), why the need for wire ties on solid wire? The wires are nice and straight and will support themselves w/o the ty-wraps.


It IS a very nice job...everyone should be so diligent in "what's behind the scenes". (Even the switch box to the left is a classy install)


~~ CELTIC ~~
...-= NJ =-...
Joined: Jan 2005
Posts: 5,476
Likes: 3
Cat Servant
Member
This install is actually done EXACTLY as suggested in NECA's 'workmanship' standard.

The two cables per clamp is in cmpliance with the UL listing. Such information is found on the box the clamps came in.

Joined: Jul 2004
Posts: 145
C
Member
When I end up troubleshooting on a job like this, yes, I cut the cable ties, but I replace them afterwards, one of the overlooked facts about such a neat installation is it encourages those who come after to emulate the work.

Joined: May 2005
Posts: 706
T
Member
Beautiful job. Be proud.

Dave

Joined: Oct 2004
Posts: 806
Member
A big thumbs up, this is a work of art! Someone has a lot of skill and pride in workmanship for sure!

With that said, since it looks like the feeder has to enter the bottom, how are they gonna get them up to the top lugs without destroying this nice work?


Stupid should be painful.
Horizontal Ad
Joined: Jan 2002
Posts: 1,457
E
Member
Blue ty wraps...blue ty wraps....you can't use blue ty wraps.... blah blah blah....

Seriously awesome job. Send this over to Mike Holts board for a real evaluation. [Linked Image]

Joined: Jan 2003
Posts: 4,391
I
Moderator
Quote
Seriously awesome job. Send this over to Mike Holts board for a real evaluation.

LOL, No doubt Jim of FL would find fault with it.

Of course it would work better if it had a feed. [Linked Image]


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Joined: Nov 2001
Posts: 745
M
Member
Put a plexiglass cover on this one - it's too nice to be covered up with the usual solid metal cover [Linked Image].

Question: Does derating come into play here, given the small amount of bundling of conductors?

Another question: under what circumstances would a panel be wired before the service conductors are installed? Just curious, because it seems traditionally that the service always comes first...(e.g. chicken or egg...?)

Mike (mamills)

Page 1 of 4 1 2 3 4

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

Member Spotlight
HotLine1
HotLine1
Brick, NJ USA
Posts: 7,413
Joined: April 2002
Top Posters(30 Days)
Popular Topics(Views)
363,268 Are you busy
286,050 Re: Forum
264,619 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5