ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Elk’s Lodge 11th hour ritual chime clock
by lemahj - 09/26/23 10:24 AM
Strange breaker tip problem
by gfretwell - 09/25/23 08:13 PM
An impossible Support Violation
by gfretwell - 09/12/23 04:29 PM
How are you Jersey folks about the windmills?
by gfretwell - 09/08/23 02:21 PM
Having trouble logging in?
by Admin - 09/01/23 10:26 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 22 guests, and 11 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#116439 04/02/04 02:24 AM
Joined: Oct 2000
Posts: 3,676
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]

[Linked Image]
Quote
Found these at an "Authority" in "Sports" goods store, in a nearby community. Seems like they wanted to guarantee that the horns were visible, and audible, even if they weren't installed quite to Code!

They're run to 1/2" EMT which is bent at an angle to fit it into place, and then was screwed to the shelving rack unit with what appears to be a drywall screw.

- DougW

#116440 04/02/04 05:25 AM
Joined: Jan 2003
Posts: 4,391
I
Moderator
We do a lot of warehouse stores and this is how they have us locate the horn strobes also.

Yes we do make a lot on call backs as they do get broken, knocked off and crushed by the forlk lifts.

What are you going to do, in this area you do the Fire Alarm off of stamped and aproved drawings, if we do not follow them we will be back charged (for delay of ocupancy) when the FD inspects and wants the HS where shown. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#116441 04/05/04 12:49 PM
Joined: Mar 2004
Posts: 16
F
Member
The designers and specifiers need to visit the jobsite, or at least follow up on the as built conditions. We had a job where I work that was new construction of a dairy milking parlor. The entire milking and processing area had to be tiled to meet the requirements for hot water(180 deg.)washdown. The engineer specified
smoke detectors in the exit corridors(tiled,of course). Ever try using a smoke detector in a shower?
We got permission to convert the wet locations to 200 deg ROR heat detectors. We also added raintight covers to the signalling devices.


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
BEAMEUP
BEAMEUP
WA
Posts: 27
Joined: December 2004
Top Posters(30 Days)
lemahj 1
Popular Topics(Views)
311,122 Are you busy
237,512 Re: Forum
221,282 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5