nope, house
added onto, the new additions foundation was close to the original meter (shown in pix one )
the excavator had exposed the pipe for the duration of the foundations installation, and had not taken care on backfilling
honorable mention to those 'H' taps @ the weatherhead there too...
![[Linked Image]](https://www.electrical-contractor.net/ubb/biggrin.gif)