ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
LED retrofit flickers
by rmiell. 01/18/19 08:49 PM
Israel
by Texas_Ranger. 01/14/19 07:12 AM
Free Code class in Maryland 1/16/2019
by Admin. 01/12/19 05:43 PM
Calling all Non-US members!! (Non-US only)
by RODALCO. 01/12/19 02:37 AM
sec cable code conflict
by jake2018. 01/11/19 07:36 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 20 guests, and 22 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Barricades #112184
04/22/01 09:49 AM
04/22/01 09:49 AM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,527
NY, USA
[Linked Image]
Submitted by S. Wilson (electure)


The tenants in this bldg. mentioned that they were pleased to see that someone installed barricades to protect their forklift chargers. (There was another one right up against that tranny, but they moved it so I could get to the trans... & verify that it was cooked!)

S.Wilson

Tools for Electricians:
Re: Barricades #112185
04/22/01 11:02 AM
04/22/01 11:02 AM
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Ahh, one of my favorite violations.

Working clearance? We don't need no stinking working clearance.

Besides working clearance (mainly for the panel & safety switch), was there adequate ventilation clearance for the transformer? Most of the ones I've dealt with required 6" of clearance on the backside.

Tom

[This message has been edited by Tom (edited 04-22-2001).]


Few things are harder to put up with than the annoyance of a good example.
Re: Barricades #112186
04/22/01 01:17 PM
04/22/01 01:17 PM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,904
NY, USA
Tom,

You're reading my mind!
That transformer looks like it's right up against the wall.


electrure,

What was the reason for failure? Any ideas?

Bill

Re: Barricades #112187
04/23/01 07:13 AM
04/23/01 07:13 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,278
Fullerton, CA USA
The trans was blocked on 3 sides (that's a sheet of plywood) but did have 6" in back.
The old one was scrapped before I had a chance to check it out. The 90 A primary C/B was tripped. When I tried to reset it, it took out the GFI for the building. When replaced, the secondary load was less than 100A It's a 75 KVA with 200A Main in Load Center. Any ideas??? (that's smoke on the wall)

[This message has been edited by electure (edited 04-23-2001).]

Re: Barricades #112188
04/25/01 05:27 AM
04/25/01 05:27 AM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,372
electure;
fried primary, dead short ? better a main GFI that the entire punch going to the prim CB !

[Linked Image]


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 4
Popular Topics(Views)
252,825 Are you busy
189,618 Re: Forum
179,282 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.021s Queries: 14 (0.004s) Memory: 0.9686 MB (Peak: 1.1077 MB) Zlib enabled. Server Time: 2019-01-23 10:11:51 UTC