wa2ise,
You've hit exactly on my dilemna.
I've scolded and mouthed off (you think I came up with this "electure" stuff all by myself? It was a nickname given to me by co-workers when the word "electure" came up in the 2000 Presidential elections. My ravings about Code & safety caused it)
The fingers would all point to me.
I'm stuck, guys. All I can do is wait it out, and hope that nobody gets hurt in the interim.
There's been an inspector, recently retired, that's been through this place many times.
Although he was pretty good on collecting permit fees, it seems he was blind in one eye, and couldn't see out of the other.
Hopefully, things will change.
BTW, this lab has a myriad of different receptacles available, from 15A 120V through the 100A 208V. The guy always seems to pick the biggie, though. I'll try to get a pic of his "adapters"
...S
PS. He's an ME, Manufacturing Engineer, not a PE, he can't overrule anything.
[This message has been edited by electure (edited 03-15-2004).]