ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Where is Everyone?
by Jim M - 06/23/21 10:04 PM
Happy Father's Day!
by Bill Addiss - 06/19/21 04:16 PM
A Risky Setup
by timmp - 06/18/21 08:08 PM
Conduit over Vinyl Siding
by Jim M - 06/16/21 08:30 PM
Updated Forum Software
by Admin - 06/15/21 10:23 AM
New in the Gallery:
2020 - 2021 Winter Project
2020 - 2021 Winter Project
by Bill Addiss, April 29
Garden 2021
Garden 2021
by Bill Addiss, April 26
Who's Online Now
0 members (), 46 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#106848 01/11/05 11:45 PM
Joined: Oct 2000
Posts: 3,661
Likes: 1
Admin Offline OP
Administrator
Member
Quote
This panel has an obvious 100-26 violation. The strange thing is that this is the only equipment installed in a 50’ x 50’ basement. With all that open wall space, this equipment was located in the same space. Notice the notch cut in the panel door to allow it to open a full 90 degrees.

SteveE
[Linked Image]

[Linked Image]

2017 / 2014 NEC & Related Books and Study Guides
#106849 01/12/05 06:45 AM
Joined: Jul 2002
Posts: 8,407
Member
A couple of questions spring to mind here.
First of all, was the concrete pad installed to give a working platform for those that may work on the Panel?.
Just because it's roughly the same size as the Compressor cylinder, shouldn't mean it was put there for the purpose.
Secondly, would the rising heat from the compressor copromise the protection in the panel?.
Also, there doesn't appear to be any supports on that orange conduit coming in from the left. [Linked Image]

#106850 01/19/05 05:05 AM
Joined: Dec 2004
Posts: 354
K
Member
And that orange pipe veers off at an angle across the other straight(ish) pipes. Whoever put that in clearly wasn't concerned about aesthetics.

#106851 01/19/05 07:40 PM
Joined: Oct 2004
Posts: 806
Member
kiwi:

Look closer: The orange pipe angles to clear a door!! (First pic.)

Who did this install, dumb and dumber? [Linked Image]


Stupid should be painful.
#106852 01/20/05 03:04 AM
Joined: Jul 2003
Posts: 394
B
Member
Well clearly, they only had six foot of wire on the cart the day they installed the compressor and the boss was in a hurry for air!

#106853 01/21/05 08:34 PM
Joined: Apr 2003
Posts: 60
C
Member
Long term lurker here... the more I look at these pictures the more things pop out at me.

Maybe my perspective is off, but that orange pipe looks like it would certainly place second to having that roof support right in the middle of the door.

The disconnect and starter for the compressor look brand new, but what the heck is that red wire snaking out of the disco?

The discharge pipe for the compressor goes an odd way, threading between the panel and the disconnect.

As for the concrete pad, everything in the room appears to be raised, maybe there are some issues with the sump pump/ drain.

Are thsoe chemicals I see stored behind the compressor, below the panel?

That panel looks far older than the compressor, maybe they replaced a smaller unit at some point, and notching the door is a rather poor solution.

Unfortunately, I would bet this is not an unusual condition for these types of installations. There could be enough work here to keep someone quite busy.


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Top Posters(30 Days)
Admin 10
Popular Topics(Views)
280,476 Are you busy
213,562 Re: Forum
200,434 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5