ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
by gfretwell. 03/24/18 02:10 AM
Recall Notice Kidde Smoke Alarms
by dougwells. 03/22/18 01:40 PM
Recall notice: Southwire wi-fi wall switches
by sparkyinak. 03/15/18 06:03 PM
Goodman Manufacturing Recalls Modular Blowers
by Admin. 03/13/18 10:40 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 11 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
City of Bend, Oregon gets tough with live wires! #105892
09/15/05 02:49 PM
09/15/05 02:49 PM
Joe Tedesco  Offline OP
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA

In line with ORS 479.710, which states, “Electrical installations must meet
minimum safety standards. (1) Except as provided in ORS 479.540, no person
shall make, supervise or direct the making of an electrical installation which does
not meet minimum safety standards.” As stated by John Powell, Chief Electrical
Inspector for the State of Oregon, at the last industry meeting held September 14,
2004, unsafe installations would include connecting all breakers to the circuit
conductors without a device on the end of the circuit. Any circuit that is
energized or could be energized by turning on switches or breakers are
considered unsafe and are subject to $1000 fine and suspension of license to the
At this time, the City of Bend will approve with
exception any such installations. The responsibility of making any installation
safe is up to you. But as of October 1, 2004, such types of installations will be
Thank you, Lukas L. Koomen, Chief Electrical Inspector
• Conduit straps not approved to support SE cable.
• Two gang nail on boxes not approved for range cable.
• Approved fittings required for 8/3, 6/3 cables for panel and boxes.

City of Bend
Community Development Department
Building Division
Bend, OR 97701

[This message has been edited by Joe Tedesco (edited 09-15-2005).]

Joe Tedesco, NEC Consultant
2017 / 2014 NEC & Related Books and Study Guides
Re: City of Bend, Oregon gets tough with live wires! #105893
09/17/05 01:01 PM
09/17/05 01:01 PM
ShockMe77  Offline
Joined: Jun 2005
Posts: 821
Rahway, New Jersey
I used to put everything under a breaker and then tape them off until I returned to do the trim out. The new company I work for has a different policy and I think its better than the old one. Now when we tie in the circuits we put the breakers in but NEVER put them under the terminal until everything is in. Now I prefer this policy. My tool supplier, though, hates this policy because I dont "blow up" as many linemens pliers as I used to!

Re: City of Bend, Oregon gets tough with live wires! #105894
09/19/05 09:06 AM
09/19/05 09:06 AM
IanR  Offline
Joined: Dec 2004
Posts: 328
Palm Bay FL USA
"My tool supplier, though, hates this policy because I dont "blow up" as many linemens pliers as I used to!"

LOL Yeah, I think we all have a pair with a mysterious notch in the cutting surface!
[Linked Image]

Re: City of Bend, Oregon gets tough with live wires! #105895
09/25/05 01:46 PM
09/25/05 01:46 PM
dlhoule  Offline
Joined: Apr 2005
Posts: 73
Saline, MI 48197
Isn't that how you get wire strippers?


2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman


Member Spotlight
Posts: 28
Joined: February 2011
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 5
Admin 4
Popular Topics(Views)
244,895 Are you busy
182,008 Re: Forum
172,041 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.022s Queries: 14 (0.005s) Memory: 0.9607 MB (Peak: 1.0919 MB) Zlib enabled. Server Time: 2018-03-25 01:45:00 UTC