Don, you are absolutly correct. In N.C. all O.R.'s must be supplied with Isolated Power systems so no problem here. I thought FL still mandated them as well. (guess I was wrong)
For an article from another frustrated Facilty Person on the
Wet Location topic, click the link below.
http://www.healthcareengineering.net/archive/phile/Article.aspx?aid=192 And a little more information.
http://www.healthcareengineering.net/archive/phile/Article.aspx?aid=190 Roger
[This message has been edited by Roger (edited 07-31-2005).]