There should be 2 electrical plans.
One plan for the inspector. It is as close to blank as possible. I prefer a statement saying only "electrical to conform to xxxx NEC."
One plan for the installer. It should specify only those parts of the system that are important - placing of important recepts and lights, placement of subpanels, how the circuits are spread over the building, which side of doors light switches are on, where to drill holes in LVLs.
The less there is on the plans, the closer the installer can work using the methods and techniques he is comfortable with.