The hot tub is already installed it is on some sort of brick pilings. I will stub up directly inside it therefore no problem with pipe damage.

The problem with pipe damage is on the wall of the house where the disco will be.

The panel is not in the attic, but it is inside about 30 feet away from where the tub is, hence the run in the attic after I get to the house. Would be nice if it was outside.

I am quite aware what she makes as a manager type person. As stated in my first post she lives in the sticks and cannot find a contractor to come out and even look at this.

More than likely I will use rigid from the disco down to the first 90 so it will not get broken.

Belive me, I wish there was an estimate from another contractor so I can compare.
In the past when offered side work I have told people to get a legit estimate first and then see if I can even save them anything. Most of the time I cannot. In fact most side work I have done is on the barter system.

I will look into having it inspected.

Thanks for all your help