Around here the framing inspector will not show up untill the electrical HVAC and plumbing inspectors have signed off thier rough ins. If called they look on the plans to see the rough in stickers (the Gc is required to have approved plans on job site), if they are not there the framing inspector red tags job as not ready for inspection and walks away and charges the GC with a re inspection fee.