No, pipe is not required, but the only SE cable my supplier has is #2 Al SEU and SER and 4/0 Al SEU and SER. Any other size and it has to be THWN or RHW-2 in Pipe. (Don't like SE Cable anyway...)
I've had better than a dozen or so inspections (I'm sure some of you have that many a week!). Usually I can point out more violations than they can...
I wish that the inspections were for all phases of work rather than just services.
I wonder if I could pass a rough-in inspection...?!?!?!
[This message has been edited by sparky66wv (edited 09-29-2002).]