We see several non-electrical contractors do this all the time. Most are boring for telco and cable service, but some lay in power conduits also. Usually the poco of an electrical contractor pull the wire for power. The telco and cable has almost anybody pull the wire or fiber.
As long as it works and is safe the inspectors pass it by.
The inspector will check to see if a permit has been pulled for secondaries - only ECs there.


ed