The inspector doesn't ever have to accept something just because it's made it through plan check. This comes up on a regular basis. If you mention it, the inspectors just get mad (power trips). Someone just needs to call the engineer and have him modify it.

(Where the heck are you even going to find green/white tracer wire?)