I desgined it.. the boss reviewed it signed and sealed the drawing along with the permit app. He then took it the township. Everything was A-OK said the inspector, and he sent in the cut-in-card.
Pretty simple service, overhead 4" pvc with 500 mcm to meter socket, 4" pvc & 500s out of meter socket to new 400 amp main breaker NQOD panelboard. 200 amp sub-feed breaker to existing panel.
Building is on the end of a street, has its own set of transformers on the pole. 120/240 3 phase delta.
The existing 200 amp meter is still in use till the new service is hooked up .. I am wondering if they some how think it is staying ?? Maybe that is why they want a disco ?? Here is ACEs Service Handbook.
http://www.atlanticcityelectric.com...chures/street_lighting/elec_srv_hand.pdf