I'm an apprentice and don't have much experience yet but wouldn't it be cheaper to replace the existing MM/Combo with a 200 amp subpanel and move the MM/Combo to the new location. Seems easier and cheaper to refeed the sub then splicing all the circuits in a J Box and running them through a single pipe back to the meter main. Derating will become a major factor with that many circuits.