Once again I've landed on a job run by the cast of the muppet show....
It seems that everyone south of VT comes here to either run a Bed & Breakfast ( too many Bob Newhart reruns), or build a log cabin ( Grizzly Adams??).

This one's a log cabin, most of which i'm called in on after the first 3 logs are set on the foundation ( about 18") . Sometimes the GC has figured the basic 6 & 12' rule and drilled down thru, sometimes not. Most doorway switch locations ( given the door swing) are obvious.

This time, it's all built! No access has been provided or even thought of , as i sarcatically asked the owner if the GC ( Elmo?...Oscar?) had a 5' drill.

I have wired my share of these, but have never really been privy to the instructions. Does anyone here know if there is something that even eludes to ' get the wire there'??


Mz Piggy stompped off the site pissed!