"Seriously, can you simplify it..."
Man, I wish I could!
All exposed ceiling with minimal walls in a huge space, and the Arch's don't want to see conduit?!?
So now they are trying to get me to follow thier wacked ways of "hiding" it.
Most of the time I can take a set of plans and lay it out with line diagrams, and have the crew just go to it. And what I get is a two dimentional plan, and two dimentional conduit runs.
So now as I lay it out, I have to call out elevation too. And the changes in elevation. Track all the extra bend, etc.
Ah... Maybe I'm just B&@%#ing.
But there must be a better way for laying out something like that. Like AutoCAD specifically for conduit runs. Feed in plans, and it does the lay-out, wire, and bend count for you, and spits out a new set with exactly what you're suposed to build for you.
A genie in a bottle would be nice too!
![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
So instead, I am ordering several cases of LB's, TB's, and C's, which mean 3-point pulls.
We added a change order for this wacked out idea, so not worried 'bout the money. But now I have to do it!