One bucket of the mcc is feeding a transformer which in turn id feeding a 120/208 panel. This panel is feeding two controll panels for all my controll wiring.
Each bucket of the mcc has a TRF for the coils within it.

I did not bid the job but the nuetral was included in the bid so IMO it should be included but my superiors think different.

This post is mostly meant to justify my thinking, I wanted to make sure I wasnt missing something.