I'm back from vacation and the worst has happened. They want a new cable run.
18/3 belden, (one spare), 625', 25' ceiling. I am sure it won't fix the problem, but it wasn't my decision.
I hope to start at one end with 1000'pull-out box of cable in the manlift, pull it through the mess in the ceiling, leaving loops every 20-30'. Then follow it back and ty-rap it neatly to existing pipes etc.
Is there an easier way, or am I doomed to a week of frustration?
Pull a string first perhaps? Start in the middle?