Or you arrive at the job late, because you had to stop and pick up material, just to find one of the carpenters running wire, because the GC told him to finish up one section because they want to drywall today, and you find they made splices in the wall without a box and behind the shower stall.
ON that job I called the local inspector and Bi#$%$# up a storm and shut it down for about 2 1/2 days. But I am old and can get away with it..... I guess.
As I explained to the inspector, this job is on MY ticket, and if there is a mistake I want to make it, not be blind sided by some sneaky GC, becuase hes behind on his schedule.

Wm.Colt