Drawings show 42 inch trench with HDPE turning up into primary side of transformer Pad.
As Carlon shows 30 X Conduit size radius as min. bending allowed I think factory 90's are required
Anyone have experience with this???
Yooperup

Last edited by Yooperup; 07/11/17 09:06 AM. Reason: Mistake