The problem with utility distribution over the air is how you keep that much energy going straight to the receiver and what happens to anything that gets in between. They are already frying birds at the solar concentrator sites. If they are having this much resistance to a couple of miliwatts of RF in a smart meter. Imagine a megawatt transmitter on every block.