Greg:
Here, the EC (or HO) does the disconnect and reconnect on service upgrades. (Overhead)

The BUD's all that is done is pull the meter.

The POCO does a crimp connection and re-seal the meter pan after inspections & cut-in-cards.

PSE&G supplies meter pans, JCP&L does not.


John