The thing that always amazed me was how sloppy the FPL contractors were (watching them at my wife's place 2004-6). There was always a lot of the 4/0 conductor in the dumpster after a lateral install. In one case I saw over 50 feet. They just spooled off a bunch, built the pipe as they go with the wire in it and cut off the excess.
It went real fast that way but material was certainly wasted.
In those days material was wasted a lot anyway. Time was money.
I bet they run a tighter ship now and the scrappers would be raiding those dumpsters every night.


Greg Fretwell