Originally Posted by gfretwell


This was submitted on another BB asking if it should be reported to the PoCo.

I think we all agree this needs to be fixed but I don't think I have ever seen the drop hung on the surface of the roof. (one anchor broke)

I assume the PoCo will swing a triplex from the mast when they get there.
I seem to recall seeing some sort of roof mounted point of attachment thingy, but don't remember where.

POCO answers may depend on where this is.

On Long Island the POCO would not allow point of attachment to a conduit less than 2-1/2" GRC.

They'd have an issue with current point of attachment that can't be reached from a ladder placed on the ground. (looks like a small addition was added there to the right of meter.

My guess is (here) they'd want the POA moved up higher on the roof, or attached to Fascia (if solid support is there) in front of Mast.

Bill