Sorry to Hijack this thread.....

Here in the UK, there is limit of 2m between the output side of the meter & the breaker panel. If you cant meet this requirement then you need to provide overcurrent protection before the start of the run (ie at the meter) to the breaker panel. Is there no similar regulation in the NEC?