I'm not keen on acwu from the meter to the panel, but I can remember when the refrigeration lines to an air conditioner where cut and welded. Now, everyone uses a pre-charged line and it's the new norm. I suppose acwu could be the new thing for services. It's ugly, but so are pot lights and everyone has them.

By the way, how do you get three straps on an 8 foot mast? One foot above the rack, three feet above the roof and one foot in the soffit, leaves three feet for straps. (You can't put a thru-bolt at the roof line on a cottage roof) That puts three supports on three feet of mast.

Mast kits in Saskatchewan don't even come with three straps.