I have one pretty good question for ya North América guys someone asked me a good question related to the solar panel mounted at seperated structure or building now for the NEC code stand point they will not only required the disconnect switch at the solar panel location but also a disconnect switch at net metering location where the solar panel controller will show up { there will be two conduits running underground } so what the NEC code stand on this one ??

I know in France we have required disconnect switch at both location for detached building.