Reno:
Sounds like we may need a furniture placement 'code'?

Seriously, a resi buyer should 'walk' the structure before the 'roughs' of all trades, but that's in a perfect world.

Should the EC of the job talk to the buyer (with the builders permission) and up-sell the job? I sure would hope so; and that should solve the 'added' receptacles, lights, switches, appliance feeds, jacuzzis, and all the other toys.

As an AHJ, the required items must be installed for me to pass a rough.



John