OK, we all know that the EC has to install that new intersystem ground block as per 250.94. Here comes the question,

Is the EC required to run a grounding conductor from this ground block to the Telco /CATV equipment? Or is the EC just required to install that ground block and then have the Telco/CATV people come back to install their own grounding conductor?