I would maintain that, even if multipme structures are involved, that the 'six throws' rule still applies. It's still one service, at one location, with lots of meters.

Even if there were two true services - say, of different voltages - I'd expect the total number of "main" disconnects to be six or less.

Speaking academically, I would accept contactors on those feeds, with the coils switched by the 'main disconnect' switch. This would possibly reduce the expence of providing a ridiculously large single switch.

Yet, I have seen literally thousands of apartment buildings with more than 25 individually metered units, and a single main disconnect, so the disconnects are readily available.