I will have them on hand (threaders). Another thought,to avoid down time. How about if I temp out the pumps with NM? The round box at the pumphead,this way the pumps can still operate.
Only catch,the conduit IS the ground.
Think I'm looking at a regular shut down. Thanx Guys. Sorry for the 'bone head' dilemma.