HOLLY CRAP!!!!
If it's that much trouble why don't we require multiple conduits to each location?
So I assume it aint a 'shut down the pumps for 3 hours' deal?
HOLLY CRAP (oops I stated that already)
I got a 'JB' in the building,then an 'LB' down,'EY'. The inline wich-a-ma-callit- and the pump 'JB'.
Maybe 30' Tops!!
A great friends brother (I may add I have not paid for auto repair in 10 yrs).
HOLLY CRAP!!!
There has to be another option than re-pipping,and a total upgrade. This ,I'm sure, is not the first conductor to fail in a filling station.
It is 3/4 conduit with 2-220V ckts. not a problem to pull in ALL new conductors. But why should it become a 'Project'?