Hi to all,
I'm dealing with a 3phase, ungrounded, system. The owner has a private submeter and wants to install a PSE&G meter. He says his meter shows about 800 to 2000 kwh per month. He currently has a 200A, 3phase service, but PSE tells him that with those numbers he's giving them, he will need a 2500A Service! Can someone explaing their method of determing service required? Thanks, Walter