What a shambles! Looks like the temp site setups on a large building site.
Would I be correct in thinking that the large (insulated) pipes at the base of the "apartments" would be central heating systems - ie a central boiler or other source feeding a number of separate buildings? Or even geotherm?
If hindsight were foresight, we'd all be millionaires!