Hang on a sec Paul Cornwall, If you had 415V at your fittings, would that not mean that a Neutral had been left out and swapped for a Phase conductor?. 2 Phase 400V is quite common here in the country for Ranges and other heavy loads. Are your Power Authorities, not required to do a polarity test after they energise an installation, temporary or not?.