Picture #1 - He roughed for recessed lights and then he couldn't find the the wires. Why not put the housings in , in the rough?
Picture #2 - Why not a 2-gang? the switch on the right had wires in the box, but none to the switch?
Picture #3,4,5 - The builder finished the basement, he told the builder that he had to move the panel forward?
Picture #6 - 200-amp cable twisted, connectors on the meter socket were not even tightened.
Picture #7 - I count 13 conductors plus the grounds.
The basement two 3-ways and two 4-ways that did not work. He ran all of the travelers to one junction box, I counted eight 3-wires and two 2 wires in one standard 1900 box with no cover, I guess he couldn't get it on.