Here's another service:
Quote
Here is a pic of an install where the feeders to the subpanels pass through other panels.
The feed comes in the top of the left-most panel (the one with the meter). The bottom section of that panel has breakers for each sub-panel; the feeders then pass right through other panels on their way to their respective panels.
Since everything is off the same meter, I don't see a problem with this arrangement.

Renosteinke.

[Linked Image]


Click here for larger image .