This whole install would have been much nicer if a ground bar was put in the wire trough and then brought back to the main panel. Then the split bolt would not have been needed using one big #6 ground back into the panel. And then the 'neutrals' could have been on one side the 'grounds' on the other. Then we can either put in the green screw or remove it if it's a subpanel. Right?

It took me several minutes of reading and looking at this thread before I realized that that green tape and all those grounds were coming from that wire trough.

Shame Shame. It's like they almost knew what they were doing until they had all those bare copper wires to deal with.

Is it safe? Yes I think in a fault condition it would perform. Ultimately that's the test. For the most part it's a nice clean installation.

It's almost like the installer ran out of parts and just shoved in that split bolt to go fishing early.

RSlater,
RSmike