From the E-Mail Bag:
Quote
Being the G C at a job site . When a subcontracted electrician failed to call for an inspection after completion of his rough wiring. And then went on vacation . As the holder of the building permit, I called the electrical inspector for a inspection in XXXXXXX, XXXX. Having been told by the electrical SUB contractor He was ready for said inspection.The inspector told me it was none of my business to call for an inspection , And he wouldn't come out to inspect . What is the proper procedure for replacing this subcontractor and bringing a formal complaint against this inspector ? Being the H I C contractor and licensed construction supervisor responcibel for all activities on said jobsite. Having suffered consideriabel time losses do to the failure of not only the electrical contractor and the electrical inspector at the given site.

E.F.