So those are sill plates, I always wondered what the were used for, pictured where the SE enters the building. Is that last meter allowed. I know that on some 2-gang meter sockets there is a label stating that the other set of lugs are not meant for feed thru.
[This message has been edited by HCE727 (edited 01-01-2007).]
[This message has been edited by HCE727 (edited 01-01-2007).]