ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,316 Are you busy
174,784 Re: Forum
167,153 Need opinion
Who's Online Now
0 registered members (), 69 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#76436 - 02/06/01 10:07 PM 300-4-d  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
300-4-d basically tells me to maintain that 1 1/4" from a framing member's edge. Well this gets fairly hard to do when interior walls are 2"x4", or really 1 1/2" x 3 1/2" , particularly in the area of wire entry into the switch box, which , volume needed is usually the deeper variety.

Any quick fixes out there?


2017 / 2014 NEC & Related Books and Study Guides

#76437 - 02/07/01 12:35 AM Re: 300-4-d  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Sparky,

1 1/4 from each edge on a 2 x 4 gives you 1 inch to play with down the Middle. You are right about where it enters the box being close to the edge. Some boxes may have a center ko on top that would help maintain the clearances from edge(s) of framing members. I have never heard of this being an issue though, has anyone else?

Bill


#76438 - 02/07/01 09:45 PM Re: 300-4-d  
sam  Offline
Member
Joined: Jan 2001
Posts: 29
guys when in doubt i always put a plate on the board to protect from nails. better safe than sorry. a nail or screw should not be install around edge of box to penetrate the
wire. but that is a good point never thought about it can't idiot proof every thing


#76439 - 02/07/01 10:07 PM Re: 300-4-d  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Sam,

I think Sparky is talking about the deep variety of boxes which would have the cable entry just about up against the back of the wall (w/2x4) and subject to penetration from the other side of the wall where the box can't be seen.

I've wondered about that too, but I guess it is not an issue. I haver never heard anyone else discuss it.

Bill


#76440 - 02/08/01 08:21 AM Re: 300-4-d  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
Sam, i use a lot of nail plates also, it's cheap insurance. [Linked Image]
I had recently roughed out a place, all 2X4's and started doing just that as a final touch.
I use the deeper variety of boxes for fill, so many are almost as deep as the 2x4.
So looking around, this would mean every receptacle and switch , which is a lot of nail plates.
One would think it's a non-issue, in that the device box is viewable from one wall side for those who renovate, hang pictures, etc.
Yet it is still a code i'd like to address in an economical manner.
So to the BB"s i go, and ask... [Linked Image]

Back when he was around, Bruce Lee was asked what style he was, his reply was " I am all styles and none" .
He had studied all, and took the best of what he found.

So, in that same vien, i ask... [Linked Image]


#76441 - 02/08/01 10:16 PM Re: 300-4-d  
sam  Offline
Member
Joined: Jan 2001
Posts: 29
the day a person stops learning is when (or should be ) he passes on from this world.I really enjoy this web site!



Member Spotlight
BEAMEUP
BEAMEUP
WA
Posts: 27
Joined: December 2004
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7763 MB (Peak: 0.9213 MB) Zlib enabled. Server Time: 2017-07-25 04:44:46 UTC