ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 6 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Mud Adobe #61718
02/01/06 09:23 PM
02/01/06 09:23 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 721
Tucson, AZ USA
Here in the "Old Pueblo" we have a good many mud adobe structures, some dating back as far as the 1800's. In recent years these historical homes have been in such demand that they are being bought up by big money and restored. One of the problems with mud adobe is getting a panel to "stick" on the outside wall. The ancient original services were so tiny that a board with 6 or 8" nails driven at angles was a sufficient mounting surface. But try hanging a 40/40 200 amp meter combo with an overhead service drop!

So far I have: 1. ran allthread thru the wall and bolted it on the inside and 2. Drilled out the mounting holes then twist the drill around to make a cone shaped hole, smaller at the surface, so a large toggle bolt will grab hold. For the mast we drill thru the parapet and use allthread and a large steel plate on the backside.

My question is for those who have dealt with real mud adobe, if you have any tricks or ideas that might help to secure a panel to the exterior wall. I am thinking of using epoxy to anchor some long 1/4" bolts facing out, then return the next day and mount up 2 pieces of unistrut & bolting the panel to the strut. I also thought of building a 4x4 and plywood stand like a temp service but that is a lot of work, especially with the ground out here being very hard to dig.

So it would be great if anyone has any tricks or ideas to offer.......

Thanks...Brian, Tucson, AZ.

Work Gear for Electricians and the Trades
Re: Mud Adobe #61719
02/01/06 10:52 PM
02/01/06 10:52 PM
C
Clydesdale  Offline
Member
Joined: Nov 2004
Posts: 138
wow..no tips...but that sounds pretty crazy
just curious...how much co you whack em for on such a "custom" installation?

[This message has been edited by Clydesdale (edited 02-01-2006).]

Re: Mud Adobe #61720
02/01/06 11:00 PM
02/01/06 11:00 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 721
Tucson, AZ USA
Larry Fine came up with the solution, drill all the way thru, then use allthread and fender washers recessed into the wall on the inside and patch over them with plaster.
I will let you know how it works since I have one next week. The job is usually worth about $1,800.

Re: Mud Adobe #61721
02/01/06 11:01 PM
02/01/06 11:01 PM
H
highground  Offline
Member
Joined: Nov 2004
Posts: 53
Chama, NM
Brian,

I'm in Northern New Mexico and have to deal with similar buildings. Through bolting when practical is best. Depending on the adobe, sometimes long wood screws or 1/4 lags will hold amazingly well. I use a piece of shallow strut with as many 10" lags as it takes. If they hit a void move over and try again. Never tried epoxy.

Search for my "Today at Work..." post in the Photos Submitted for Discussion Forum for some pictures you can relate to. This was a service change the homeowner got a start on.

Good Luck

Re: Mud Adobe #61722
02/02/06 03:30 PM
02/02/06 03:30 PM
D
DougW  Offline
Member
Joined: Jun 2003
Posts: 1,143
North Chicago, IL
I think I'd almost ask the AHJ for an allowance to mount a meter base (and possibly the panel)on a pillar or other independent support next to the original building, rather than mess with that type of construction.

Re: Mud Adobe #61723
02/02/06 04:28 PM
02/02/06 04:28 PM
W
walrus  Offline
Member
Joined: Jul 2002
Posts: 680
Bangor Me. USA
What wiring methods do you use inside?? IS everything surface mounted?

Re: Mud Adobe #61724
02/02/06 08:45 PM
02/02/06 08:45 PM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Never worked with adobe....

I think your epoxy idea will work well for the panel. As it will be dependant on the shear value of the bolt, rather than pull out strength. However for an over-head mast, that is another story... Your current solution sounds best.


Mark Heller
"Well - I oughta....." -Jackie Gleason
Re: Mud Adobe #61725
02/02/06 09:55 PM
02/02/06 09:55 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 721
Tucson, AZ USA
"What wiring methods do you use inside?? IS everything surface mounted?"

Walrus, the older ones are wired with BX channelled into the mud then patched over. If they were build before about 1930 they usually have K & T in the attic and BX added later. Some have firred walls. For new construction we are allowed to use UF cable in the mud or joints. Usually only the outside walls are adobe, so interior wiring is inside the partition walls. The structures that still exist from the 1800's have all the walls made of mud, built with no electricity or running water. I've seen lots of "creative" methods used to bring electricity into these structures.

Re: Mud Adobe #61726
02/02/06 09:57 PM
02/02/06 09:57 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 721
Tucson, AZ USA
highground, where do you get 10" lags? are the shields 10" long or just the bolts?

Re: Mud Adobe #61727
02/02/06 10:50 PM
02/02/06 10:50 PM
H
highground  Offline
Member
Joined: Nov 2004
Posts: 53
Chama, NM
Just run the lags right into the adobe, hot dipped galvanized preferred. You would be amazed how well they bite into the mud. Here in New Mexico we have to run UF in the adobe walls, real pain in the caboose. And so much fun cutting those channels in a remodel with the electric chain saw, can you say dust mask.

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 15
Potseal 15
Popular Topics(Views)
243,597 Are you busy
180,402 Re: Forum
170,868 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.019s Queries: 15 (0.003s) Memory: 1.0223 MB (Peak: 1.1959 MB) Zlib enabled. Server Time: 2018-01-23 07:53:26 UTC