ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,199 Are you busy
174,590 Re: Forum
167,024 Need opinion
Who's Online Now
0 registered members (), 55 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#329 - 01/16/01 01:57 PM Confirming properly grounded equipment  
Harold Best  Offline
Junior Member
Joined: Jan 2001
Posts: 2
Danville, KY, USA
I work in the safety department and we utilize a new equipment checklist for any new or altered equipment. One of the items on the checklist deals with the proper grounding of equipment. I have asked various electrical contractors to confirm that the equipment they have installed is properly grounded before I complete the checklist. Does anybody have any suggestions at to the best way to confirm that the equipment is properly grounded? What type of confirmation test should we require?


Work Gear for Electricians and the Trades

#330 - 01/16/01 04:45 PM Re: Confirming properly grounded equipment  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
Harold;
the grounding requirements of article 250 in the NEC are many times pertinent to specific equipment. So you may need an answer for each individual situation. [Linked Image]


#331 - 01/16/01 05:50 PM Re: Confirming properly grounded equipment  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Harold,

Perhaps if you gave us more details on the types of equipment you are dealing with We would be better able to offer suggestions.


Cord and plug connected? - if so, are you referring to the grounding of the equipment itself or the circuit it is connected to?

What type of location is this equipment installed in? is it a Hazardous Location?
more details might help.

Bill


#332 - 01/16/01 06:02 PM Re: Confirming properly grounded equipment  
Harold Best  Offline
Junior Member
Joined: Jan 2001
Posts: 2
Danville, KY, USA
Quote
Originally posted by Bill Addiss:
Harold,

Perhaps if you gave us more details on the types of equipment you are dealing with We would be better able to offer suggestions.


Cord and plug connected? - if so, are you referring to the grounding of the equipment itself or the circuit it is connected to?

What type of location is this equipment installed in? is it a Hazardous Location?
more details might help.

Bill


This checklist is used for any new or altered equipment. The most recent items I have used the checklist on include: cardboard baler, dock locks, Landringer (puts plastic wrap around loads on pallets), production auxillary equipment, etc.

I assume you just have to look at the specific equipment and determine how the grounding should be confirmed (i.e. test with meter, etc.).


#333 - 02/12/01 03:54 AM Re: Confirming properly grounded equipment  
BR  Offline
Junior Member
Joined: Feb 2001
Posts: 1
USA
The equipment installation should be inspected to meet the requirements of NEC 250. "Checking with a meter" will not tell you much if you use a multimeter. The ohmmeter section will only measure resistance, not impedance. You need to use an impedance tester such as a Tasco Inspector, ECCOS, Suretest, or GLIT if you want to measure inpedance.


#334 - 02/13/01 08:40 PM Re: Confirming properly grounded equipment  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
BR;
May i ask which impedance tester you would recommend? I am in the market for one.... [Linked Image]



Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 216
Joined: March 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.002s) Memory: 0.7764 MB (Peak: 0.9216 MB) Zlib enabled. Server Time: 2017-07-22 08:52:35 UTC